Ausgrid Infrastructure Model

Willoughby Sub-Transmission Station

Converting point cloud data of an Ausgrid electricity transmission asset into a 3D survey model.

CLIENT

Ausgrid

LOCATION

Willoughby NSW

YEAR

2025

SERVICES

BIM Modelling.

Project Overview

About This Project

Ausgrid had provided DS&P with a colourised point cloud of their sub-transmission electrical substation in Willoughby. Showing our flexibility and embracing collaboration, DS&P were able to adopt this existing data and coordinate system to produce a survey accurate and georeferenced BIM model of the important asset for ongoing maintenance and planning.

 We were further able to adjust the level of detail of the substation and even individual electrical fittings to suit a bespoke deliverable. LOD in models can be modified to suit the needs of the end user.

Image Gallery

Project Photos

Outcome

The Result

Providing Ausgrid with a data-rich 3D model of an existing electricity asset for future planning and facilities management.

LIKE THIS PROJECT?

Let's Discuss Yours