Ausgrid Infrastructure Model
Willoughby Sub-Transmission Station
Converting point cloud data of an Ausgrid electricity transmission asset into a 3D survey model.
CLIENT
Ausgrid
LOCATION
Willoughby NSW
YEAR
2025
SERVICES
BIM Modelling.
Project Overview
About This Project
Ausgrid had provided DS&P with a colourised point cloud of their sub-transmission electrical substation in Willoughby. Showing our flexibility and embracing collaboration, DS&P were able to adopt this existing data and coordinate system to produce a survey accurate and georeferenced BIM model of the important asset for ongoing maintenance and planning.
We were further able to adjust the level of detail of the substation and even individual electrical fittings to suit a bespoke deliverable. LOD in models can be modified to suit the needs of the end user.
Image Gallery
Project Photos
Outcome
The Result
Providing Ausgrid with a data-rich 3D model of an existing electricity asset for future planning and facilities management.