Rail Station Upgrade

Sydney Terminal Building Revitalisation project

High-accuracy construction survey and laser scanning of Sydney Terminal Building precinct, delivering coordinated BIM outputs to support design and delivery of station revitalisation works along Eddy Avenue.

CLIENT

Gartner Rose

LOCATION

Sydney

YEAR

2025–2026

SERVICES

Construction Survey, Laser Scanning, BIM

Project Overview

About This Project

The project involved construction survey and spatial data capture for the Sydney Terminal Building revitalisation works, delivered for Gartner Rose along the Eddy Avenue precinct.

The works were undertaken within a complex, high-traffic urban transport environment adjacent to an active rail station, requiring careful coordination to minimise disruption while maintaining survey accuracy and safety compliance.

DS&P delivered a hybrid survey methodology combining conventional total station surveying with high-definition laser scanning to capture detailed existing conditions across the site. This approach enabled efficient capture of both structural geometry and surrounding asset data within constrained access areas.

The captured datasets were processed and integrated into a coordinated BIM model, producing a spatially accurate digital representation of existing conditions to support design development and construction planning.

Image Gallery

Project Photos

Outcome

The Result

The project provided a reliable spatial and BIM reference for the revitalisation works, improving design confidence, reducing uncertainty in existing conditions, and supporting efficient construction delivery within a highly constrained operational rail environment.

LIKE THIS PROJECT?

Let's Discuss Yours