Metro Systems Integration
sydney metro city-southwest line-wide
Line-wide survey delivery for the Sydney Metro City & Southwest program, supporting station fit-out, tunnel systems, traction power, and stabling facility works across the 30km metro extension from Chatswood to Bankstown.
CLIENT
Systems Connect
LOCATION
Sydney
YEAR
2020–2024
SERVICES
Construction Survey, Control Survey, As-Built, Laser Scanning
Project Overview
About This Project
The Sydney Metro City & Southwest project formed a major extension of the Sydney Metro network, connecting the existing Northwest line through the CBD and continuing to Bankstown via new underground and surface infrastructure.
DS&P was engaged by Systems Connect (a joint venture between CPB Contractors and UGL Engineering) to provide line-wide survey services across a wide range of infrastructure delivery packages spanning tunnels, stations, power systems, and operational facilities.
The scope included station and tunnel fit-out works, installation of track systems, overhead wiring, high-voltage reticulation, tunnel ventilation, fire services, and drainage systems. It also extended to major power infrastructure delivery, including 31km of overhead power equipment, 11 substations, and over 350km of HV/LV and tunnel services cabling.
Additional scope covered expansion of the Tallawong Stabling and Maintenance Facility, delivery of the Sydenham maintenance facility, and integration works connecting the new metro alignment into the existing network at Chatswood.
DS&P’s role required interpretation of complex design documentation, establishment of corridor-wide survey control, and delivery of set-out, construction verification, cadastral and topographical surveying, as-built capture, and laser scanning across multiple work fronts.
Spatial data was used to validate installed infrastructure and produce coordinated as-built datasets, ensuring alignment between design intent and constructed conditions across all systems.
Image Gallery
Project Photos
Outcome
The Result
The survey delivery enabled accurate coordination and verification across one of Australia’s largest metro infrastructure programs, supporting safe and efficient installation of critical systems and ensuring spatial consistency across tunnels, stations, and power infrastructure. The work contributed to the successful integration of the new metro line into the wider Sydney rail network, increasing long-term passenger capacity and operational resilience.